Warehouse Development

Here it’s always been the weirder kids, the kids that don’t exactly fit in. They find a community here.

-Ginger Ailes, junior derby skater

Warehouse Development Project

Below are some hopes and dreams for our warehouse development and funding and what we would do with funds raised for the project.

 

1/3rd Funds Raised

Uncovered outdoor space with polished concrete. Enough space to put down a flat and banked track. The banked track will be outfitted with Gator Skinz to protect it from the elements. The eventual goal will be to slowly cover the space with a semi permanent or permanent structure.  Parking will be on a gravel path. 



1/2 Funds Raised

Covered outdoor space with polished concrete.(See: Ash Pavilion) Enough space to put down a flat and banked track. The banked track will be outfitted with Gator Skinz to protect it from the elements. There will be a stretch goal of working plumbing and a slow building development around the facility, as well as enough covered space to place a wrestling ring.


Full Funds Raised: 

A full warehouse built to house a flat and banked track on polished concrete floor, with additional stretch goals of a second flat track outside. The space will be large enough to house a wrestling ring, spectator room, and ideally, area for additional workout equipment. The warehouse will have a minimum of 1 working bathroom, with stretch goals of multiple toilets, HVAC systems, refrigeration, lighting systems, video board..the works!